Past projects

It will be good to let you know some of our past projects

past projects

projects info

We have a responsibility of leaving the planet in a better state than we found it. And this is at the heart of everything that we do at Pan African Renewable Energy Solutions Ltd.

We are committed to providing cost-effective, efficient and universally used renewable energy solutions to consistently demonstrate our goal of leading the world to a sustainable future.

Oserian Power Plant

The largest flower exporter based in Naivasha. SIZE 1 MWp SAVINGS 61.5% This project is Phase 1 of a much larger renewable energy project and was designed to integrate with current geothermal electricity generation and future solar PV expansions. Driven by their desire to improve their carbon footprint and be responsible corporate citizens, this green project adheres to the strictest international standards, while also saving costs.

Captive Solar 62KW – Severin Sea Lodge – Mombasa Kenya

In partnership with our partners we supplied and installed a solar grid tie system which has provided Severin Sea Lodge savings on their energy costs. This has provided Severin with an electrical and solar training platform to the local community. We continue to provide remote monitoring and support for the system

Don Orione, Community Centre

Don Orione Community Centre is school for special needs kids and provides specialized care and education to them. We designed, supplied and installed a 15KW Solar power hybrid system with storage. We monitor and continue to provide maintenance support to extend the useful life of the system

Lagdera

In collaboration with the Rural Electrification Authority and the World Bank, we designed, supplied and Installed a Solar Mini-Grid in Lagdera Constituency located at Garissa County Kenya. The Mini-Grid now supplied clean power to over 600 households and growing. This was the first power supply in the area and is providing opportunities for the pastoralist community seek alternative livelihoods.

120KVA Uninterrupted Power Supply (UPS) Meru Highlands

Meru highlands approached us looking for a power solution that will protect their sensitive milk processing machine as well as the packing unit. We sized, designed, supplied and installed a 120KVA Industrial UPS that guarantees them clean power and has a battery backup to ensure seamless changeover in times of power supply change.

HERE ARE SOME OF OUR UPCOMING PROJECTS

Alpharama

Privam Nuts

TAKE A LOOK AT MORE OF OUR COLLABORATIVE PROJECTS